marketing@lfspaceframe.com
+86-516-8595-0258
+86 177 5193 6871
222, Block B, Diamond International, Guozhuang Road, Xuzhou, Jiangsu, China
The overall lifting technology is one of the commonly used methods for steel space frame structure construction. The space frame is first assembled on the ground or concrete structure, and then the overall lifting equipment is used to lift it into place, and finally the space frame and the support foundation are connected.
Bolt ball joint space frame, in the site construction or in use, due to various reasons need to dynamic welding, as long as the strict compliance with the corresponding technical procedures, strengthen the sense of responsibility, take seriously, careful construction, is not a threat to the safety of the structure. Can welding but not at will welding, in the absence of other effective measures, only take welding.
During the construction process, do a good job in real-time monitoring to understand structural stress changes and structural deformation, and obtain relevant information such as vibration and temperature, so as to make timely adjustments to the construction and ensure that the expected construction effect can be achieved.
The space frame structure of dry coal shed is a combination of forward releasing and evacuated quad-cones. The two ends of the space frame are put in square cone structure and the middle part is evacuated square cone structure.
From the perspective of practical application, since the space frame project requires cantilever construction and high-altitude operations, the space frame construction process has a direct impact on the quality of the project.
Products
Application
Message
Contact