The closed coal storage shed is located in the coal washing plant of Takeshken Town, Qinghe County, Altay Prefecture, Xinjiang.
The environmental protection and fully enclosed EPC general contracting project of the Aksu coal storage shed is located in Xinjiang Jinhui Zhaofeng Industrial Park, Baicheng County, Aksu Prefecture, Xinjiang.
The high school basketball stadium construction project is composed of the lower concrete frame structure and the upper two-way orthogonal space frame steel structure roof structure;
The space frame of the subway depot is 62m long, 34m wide, 1.8m high from east to west, and 1.998m high from north to south.