According to the characteristics of the project, this project adopts rectangular square pyramid space frame structure with bolt-ball joint.
This project is a class C building with a structural safety grade of level 2. The designed normal service life is 50 years.
This project is a class C building with a structural safety grade of level 2. The designed normal service life is 50 years.
The space structure of roof and frame and canopy project of the comprehensive gymnasium and library of the middle school of Shenyang Mining Bureau.
The space structure of roof and frame and canopy project of the comprehensive gymnasium and library of the middle school of Shenyang Mining Bureau.
The structural form is light steel plant, with a total construction area of about 31390㎡, includes several workshops, the largest one is for batter electrode workshop, the length of it is 163m, the width is 84m and the building area is about 13692㎡.
The structural form is light steel plant, with a total construction area of about 31390㎡, includes several workshops, the largest one is for batter electrode workshop, the length of it is 163m, the width is 84m and the building area is about 13692㎡.
The 2# stockyard shed conversion project is a closed cylindrical reticulated shell shed, which adopts a multi-center cylindrical reticulated shell structure with quadrangular cone bolted spherical joints and is closed by a steel structure.
The 2# stockyard shed conversion project is a closed cylindrical reticulated shell shed, which adopts a multi-center cylindrical reticulated shell structure with quadrangular cone bolted spherical joints and is closed by a steel structure.
The projected area is about 59967 square meters. The structure of the project is a space frame barrel shell structure. The highest elevation is about 43.7 meters.
The projected area is about 59967 square meters. The structure of the project is a space frame barrel shell structure. The highest elevation is about 43.7 meters.