marketing@lfspaceframe.com
+86-516-8595-0258
+86 177 5193 6871
222, Block B, Diamond International, Guozhuang Road, Xuzhou, Jiangsu, China
The reinforcement and renovation of the structure must be based on the actual project to carry out a multi-program comparison, under the premise of ensuring structural safety, with the principle of minimal interference with the original structural force system.
The construction feature of the starting space frame is to rotate the supporting top chord ball in the column top support,so as to start in pieces,one end of the space frame with the supporting top chord ball as the axis,the other end can rotate up and down under the action of the crane,until it is lifted to the design elevation position for assembling.
Construction process flow construction preparation → foundation review → ground assembly start space frame → block lifting → closing → correction → small unit lifting → correction → bearing welding → painting → acceptance.
In order to reduce the pollution of coal storage yard to the environment, improve the environment around the coal storage yard and enhance the ambient air quality, comprehensive treatment of coal storage yard is carried out to meet the environmental protection requirements. After sealing, it can reduce wind and rain damage, slow down the oxidation of coal pile in summer and reduce the loss, and also improve the environment and hygiene of the surrounding area and enhance the environmental protection image of the company.
At present, the overall forming method includes the work method of climbing dome, folding and unfolding work method and arch truss work method.
Products
Application
Message
Contact