The total construction area of a glass dome roof project is about 20 000 m², the roof adopts a cable rod pre-stressed dome structure system, the dome radius is 29.5m, and the dome top elevation is 17.5m.
The waste incineration power plant has two MSW incineration lines with a daily processing capacity of 300T and two 6MW power generation lines.
The main steel structure hall can accommodate 1564 people, and the small theater can accommodate 414 people
The stadium membrane structure is a cantilevered canopy structure, which adopts a tensile membrane and space steel pipe structure system.
The earliest dome coal bunker that appeared in mainland China was the Houshi Power Plant in Zhangzhou, Fujian, which was put into operation in November 1999. The diameter of the dome coal storage bunker of the plant is 126.8m, (with an area of 126201m²).