marketing@lfspaceframe.com
+86-516-8595-0258
+86 177 5193 6871
222, Block B, Diamond International, Guozhuang Road, Xuzhou, Jiangsu, China
The project is located in the Thar coal mine area of Pakistan, where the local environment is harsh. The total weight of the steel structure of the main warehouse is about 9000 tons, with 4917 components and the largest single component weighing 27.3 tons. T
The structural system is complex and the membrane roof structure is an interactive space structure system composed of radial cantilever steel trusses, columns, ring beams, rods, struts, and cable membranes
Compared with the traditional reinforced concrete structure industrial building, the multi-story light steel structure warehouse building is simpler in terms of the overall structure.
Steel structure building in our country has a certain proportion in the building, especially big frame transportation building, industrial building, tall building, gymnasium, exhibition hall, and so on.
The total construction area of an Olympic training hub is 71,166 square meters, of which: the construction area of the training building is 31,635 square meters (23,371 square meters above ground, 8,264 square meters underground), and the construction area of the comprehensive building is 39,531 square meters (34,216 square meters above ground, 5,305 square meters underground).
Products
Application
Message
Contact